...what are their really use for ? For several years, I developped and succesfully used FPGA(Xilinx, Altera, Actel) designed with strongs Static Timing analyses, with a good constraint coverage and only some lite back annotated simulations. After some recent discussions, I'm looking for external experiences that can prove me that back-annotated simulations in min/typ/max timings are not only better for design verification - I'm convinced of this-, but are necessary, even if done with the static timing analyses. Is there something I missed ? Thank you for your attention, and your remarks. Frederic.
About back annotated simulations...
Started by ●May 17, 2005
Reply by ●May 17, 20052005-05-17
Fred C wrote:> About back annotated simulations ...what are their really use for ?Evaluating synthesis tools. Debugging synthesis problems.> For several years, I developped and succesfully used FPGA(Xilinx, > Altera, Actel) designed with strongs Static Timing analyses, with a good > constraint coverage and only some lite back annotated simulations. > After some recent discussions, I'm looking for external experiences that > can prove me that back-annotated simulations in min/typ/max timings are > not only better for design verification - I'm convinced of this-, but > are necessary, even if done with the static timing analyses.If you're already convinced, why pose the question?> Is there something I missed ?STA provides 100% timing verification for synchronous designs in much less time than a back-annotated simulation requires. -- Mike Treseler
Reply by ●May 17, 20052005-05-17
Fred C wrote:>...what are their really use for ? >For several years, I developped and succesfully used FPGA(Xilinx, >Altera, Actel) designed with strongs Static Timing analyses, with a good >constraint coverage and only some lite back annotated simulations. >After some recent discussions, I'm looking for external experiences that >can prove me that back-annotated simulations in min/typ/max timings are >not only better for design verification - I'm convinced of this-, but >are necessary, even if done with the static timing analyses. >Is there something I missed ?Suppose you were designing an FPGA that would control some part of an oil refinery. Or the landing of a probe to Mars. Or the engines on an airliner. Or the dosage of radiation given to a cancer patient. Wouldn't you want to verify the design as correct in as many ways as you could? After all, do you really know that static timing analysis is correct and complete? Sure, you can check it twice, but what if you made the same mistake twice? Do you really know that the synthesis, place and route was all done correctly? I've only once know this to fail, but once might be one too many. A back-annotated simulation isn't fool proof, there are still lots of issues like crossing clock boundaries that can't be checked this way, but it is a way to decrease the risk of something critical being missed. And sometimes that matters a lot. -- Phil Hays Phil-hays at posting domain (- .net + .com) should work for email
Reply by ●May 17, 20052005-05-17
Mike, I definitely agree that STA provides 100% coverage, if you get all the constraints correct. But there are many designs where the constraints are incomplete, or may not be completely correct, and in those cases timing simulation provides some level of back-up test. In designs with multicycles & cut paths set that I think there's value to simulating to double-check you didn't cut or multicycle something you shouldn't have. Generally such constraints are set manually, and hence there is the possibility of an error in entering them. Of course, a timing simulation is not guaranteed to catch a problem even if you did make a mistake, but if you can afford the time, it may catch an issue. Most designs I see use asynchronous clears, and don't set a recovery and removal timing constraint to make sure the reset release occurs sufficiently far from a clock edge for the design to come out of reset cleanly. You can design things such that everything works even if you wouldn't pass a recovery & removal timing analysis, but again, if you don't know exactly what you're doing, or you make a mistake, you can get into trouble without this constraint. Timing simulation provides some level of back-up, although it's definitely a poor substitute for a disciplined reset strategy and a static timing analysis on it. Regards, Vaughn Altera [v b e t z (at) altera.com] "Mike Treseler" <mike_treseler@comcast.net> wrote in message news:3eva9tF570msU1@individual.net...> Fred C wrote: >> About back annotated simulations ...what are their really use for ? > > Evaluating synthesis tools. > Debugging synthesis problems. > >> For several years, I developped and succesfully used FPGA(Xilinx, >> Altera, Actel) designed with strongs Static Timing analyses, with a good >> constraint coverage and only some lite back annotated simulations. >> After some recent discussions, I'm looking for external experiences that >> can prove me that back-annotated simulations in min/typ/max timings are >> not only better for design verification - I'm convinced of this-, but >> are necessary, even if done with the static timing analyses. > > If you're already convinced, why pose the question? > >> Is there something I missed ? > > STA provides 100% timing verification > for synchronous designs in much less > time than a back-annotated simulation requires. > > > -- Mike Treseler
Reply by ●May 18, 20052005-05-18
Vaughn Betz wrote:> I definitely agree that STA provides 100% coverage, if you get all the > constraints correct. But there are many designs where the constraints are > incomplete, or may not be completely correct, and in those cases timing > simulation provides some level of back-up test.I agree a time sim can be a useful diagnostic when design rules go wrong. However, it is not an alternative to design rules. A timing sim covers function and timing too poorly to make a it an economical part of my standard development loop.> In designs with multicycles & cut paths set that I think there's value to > simulating to double-check you didn't cut or multicycle something you > shouldn't have.One of my design rules is no multicycle paths. I prefer pipelining.> Generally such constraints are set manually, and hence there > is the possibility of an error in entering them.True, but in a design composed of clocked processes, and synchronized inputs, fmax is often the only setting. It is impossible to verify synchronizers in simulation, so I don't try.> Of course, a timing > simulation is not guaranteed to catch a problem even if you did make a > mistake, but if you can afford the time, it may catch an issue.It might. When a design does not operate in the lab as it did in simulation either I violated a design rule or I need to add one. In this rare event, a timing sim is a useful tool.> Most designs I see use asynchronous clears, and don't set a recovery and > removal timing constraint to make sure the reset release occurs sufficiently > far from a clock edge for the design to come out of reset cleanly.That's a case of a design rule violation. I'd rather fix the design than see if it happens to work this time.> Timing simulation provides some level of back-up, although > it's definitely a poor substitute for a disciplined reset strategy and a > static timing analysis on it.I agree. -- Mike Treseler> >
Reply by ●May 18, 20052005-05-18
Hi, I want to thank you for this discussion. This highlights the criticity of static timing analyse, with a strong constraint coverage. The fact is that the design I'm working on requires a high level of safety, as mentionned Phil Hays. This means the cleanest design, well constrainted. But even with 100% cov. I will also use back annotated simulations, but more to cross checking a bug in the timing analyser tool/or a miss in the timing constraints as you mentionned through your experiences. Regards, Fred Cezilly Mike Treseler a �crit :> Vaughn Betz wrote: > >> I definitely agree that STA provides 100% coverage, if you get all the >> constraints correct. But there are many designs where the constraints >> are incomplete, or may not be completely correct, and in those cases >> timing simulation provides some level of back-up test. > > > I agree a time sim can be a useful diagnostic > when design rules go wrong. However, it is not > an alternative to design rules. > A timing sim covers function and timing too > poorly to make a it an economical part of my > standard development loop. > >> In designs with multicycles & cut paths set that I think there's value >> to simulating to double-check you didn't cut or multicycle something >> you shouldn't have. > > > One of my design rules is no multicycle paths. > I prefer pipelining. > >> Generally such constraints are set manually, and hence there is the >> possibility of an error in entering them. > > > True, but in a design composed of clocked processes, > and synchronized inputs, fmax is often the only setting. > It is impossible to verify synchronizers in simulation, so > I don't try. > >> Of course, a timing simulation is not guaranteed to catch a problem >> even if you did make a mistake, but if you can afford the time, it may >> catch an issue. > > > It might. When a design does not operate in the lab as > it did in simulation either I violated a design rule > or I need to add one. In this rare event, a timing > sim is a useful tool. > >> Most designs I see use asynchronous clears, and don't set a recovery >> and removal timing constraint to make sure the reset release occurs >> sufficiently far from a clock edge for the design to come out of reset >> cleanly. > > > That's a case of a design rule violation. > I'd rather fix the design than see > if it happens to work this time. > >> Timing simulation provides some level of back-up, although it's >> definitely a poor substitute for a disciplined reset strategy and a >> static timing analysis on it. > > > I agree. > > -- Mike Treseler > >> >>
Reply by ●May 19, 20052005-05-19
One other thing worth doing, if you're using Quartus -- run the design assistant. You can access it from Processing->Start->Start Design Assistant. It will check for things like an undisciplined reset strategy, missing timing constraints, lack of synchronizers/FIFOs where you should think about having them etc. It's a useful checker on a design, a bit like lint for hardware. It will flag many of the things Mike lists as poor design practice, and the more of those you can get rid of, the more you can trust that meeting your static timing requirements means your design will work without problems. Regards, Vaughn [v b e t z (at) altera.com] "Fred C" <fcez05@free.fr> wrote in message news:428bb653$0$31060$626a14ce@news.free.fr...> Hi, > > I want to thank you for this discussion. > This highlights the criticity of static timing analyse, with a strong > constraint coverage. > The fact is that the design I'm working on requires a high level of > safety, as mentionned Phil Hays. This means the cleanest design, well > constrainted. But even with 100% cov. I will also use back annotated > simulations, but more to cross checking a bug in the timing analyser > tool/or a miss in the timing constraints as you mentionned through your > experiences. > > Regards, > > Fred Cezilly > > > Mike Treseler a �crit : >> Vaughn Betz wrote: >> >>> I definitely agree that STA provides 100% coverage, if you get all the >>> constraints correct. But there are many designs where the constraints >>> are incomplete, or may not be completely correct, and in those cases >>> timing simulation provides some level of back-up test. >> >> >> I agree a time sim can be a useful diagnostic >> when design rules go wrong. However, it is not >> an alternative to design rules. >> A timing sim covers function and timing too >> poorly to make a it an economical part of my >> standard development loop. >> >>> In designs with multicycles & cut paths set that I think there's value >>> to simulating to double-check you didn't cut or multicycle something you >>> shouldn't have. >> >> >> One of my design rules is no multicycle paths. >> I prefer pipelining. >> >>> Generally such constraints are set manually, and hence there is the >>> possibility of an error in entering them. >> >> >> True, but in a design composed of clocked processes, >> and synchronized inputs, fmax is often the only setting. >> It is impossible to verify synchronizers in simulation, so >> I don't try. >> >>> Of course, a timing simulation is not guaranteed to catch a problem even >>> if you did make a mistake, but if you can afford the time, it may catch >>> an issue. >> >> >> It might. When a design does not operate in the lab as >> it did in simulation either I violated a design rule >> or I need to add one. In this rare event, a timing >> sim is a useful tool. >> >>> Most designs I see use asynchronous clears, and don't set a recovery and >>> removal timing constraint to make sure the reset release occurs >>> sufficiently far from a clock edge for the design to come out of reset >>> cleanly. >> >> >> That's a case of a design rule violation. >> I'd rather fix the design than see >> if it happens to work this time. >> >>> Timing simulation provides some level of back-up, although it's >>> definitely a poor substitute for a disciplined reset strategy and a >>> static timing analysis on it. >> >> >> I agree. >> >> -- Mike Treseler >> >>> >>>
Reply by ●May 19, 20052005-05-19
On Tue, 17 May 2005 17:52:57 -0700, Phil Hays <Spampostmaster@comcast.net> wrote:>Fred C wrote: > >>...what are their really use for ? >>For several years, I developped and succesfully used FPGA(Xilinx, >>Altera, Actel) designed with strongs Static Timing analyses, with a good >>constraint coverage and only some lite back annotated simulations. >>After some recent discussions, I'm looking for external experiences that >>can prove me that back-annotated simulations in min/typ/max timings are >>not only better for design verification - I'm convinced of this-, but >>are necessary, even if done with the static timing analyses. >>Is there something I missed ? > >Suppose you were designing an FPGA that would control some part of an >oil refinery. Or the landing of a probe to Mars. Or the engines on >an airliner. Or the dosage of radiation given to a cancer patient. > >Wouldn't you want to verify the design as correct in as many ways as >you could?Sure. But as a practical matter, there's never enough time or money to verify a design in as many ways as I could think of, even if the reliability of the product is super, super important. And were I to come up with a prioritized list of things I could do to ensure the correctness and reliability of a design, functional simulation with back-annotated timing would be near the bottom. It's not that it's bad; it's just that I can almost always find a better payoff for my time. Bob Perlman Cambrian Design Works
Reply by ●May 19, 20052005-05-19
Mike Treseler wrote: I concur with everything Mike has said here. I can count on one hand the number of times I've done a timing simulation on an FPGA design, and I have done literally hundreds of FPGA designs. It is too slow, and too easy to miss a timing parameter. Do a thorough static timing analysis and a functional simulation instead, and inspect any clock domain crossings very carefully. -- --Ray Andraka, P.E. President, the Andraka Consulting Group, Inc. 401/884-7930 Fax 401/884-7950 email ray@andraka.com http://www.andraka.com "They that give up essential liberty to obtain a little temporary safety deserve neither liberty nor safety." -Benjamin Franklin, 1759
Reply by ●May 20, 20052005-05-20
Bob Perlman wrote:>Phil Hays wrote:>>Suppose you were designing an FPGA that would control some part of an >>oil refinery. Or the landing of a probe to Mars. Or the engines on >>an airliner. Or the dosage of radiation given to a cancer patient. >> >>Wouldn't you want to verify the design as correct in as many ways as >>you could? > >Sure. But as a practical matter, there's never enough time or money >to verify a design in as many ways as I could think of, even if the >reliability of the product is super, super important. And were I to >come up with a prioritized list of things I could do to ensure the >correctness and reliability of a design, functional simulation with >back-annotated timing would be near the bottom.I agree that functional simulation with back-annotated timing is not the top of the list. If I'd be happy leaving it off for a high reliability project would depend on details of the project. There are other ways to improve the testing, and the best answer isn't always going to be the same for all projects. That keeps this stuff fun. My list for a high reliability project would start looking something like this: Design specification (I know, boring, but important). Full static timing constraints, fully documented. Good functional simulation with self checking test bench. Good board or system level diagnostics. As much run time in a realistic test environment as practical. Run time with temperature and voltage extremes (stress testing). Design documentation (really boring, I know, but needs to be done). Simulation reviews. Code reviews. Specification and documentation reviews (triple boring. I suggest frequent lattes with triple shots of espresso, if that helps). Back annotated simulations without timings. Back annotated simulations with timings. I didn't add in board level checks for signal quality, thermal design, clocking and such what. Just as important, but I'm focusing on the FPGA here. The project details matter a lot. Would it be better to improve function simulation or run a back annotated simulation with/with timing? Well?? I think that depends on how good the other ways of verification are at covering the design. What a back annotated simulation attempts to verify is that: 1) All of the tools did their jobs correctly. 2) There were no subtle error(s) in coding. 3) If timing included, that the static timing constraints were correct and complete, and that the tools correctly used them. A good board or system level test can find many the first two types of issues. A margin test(temperature and voltage extremes) can find some of the third type of issues. Does my list miss any method you find important? Would you put things in different order? -- Phil Hays Phil-hays at posting domain (- .net + .com) should work for email